EABH Future Campaign
A major gifts effort to support EABH's vision and long-term strategies
One way to support the school’s vision and strategic priority is by making a transformational gift to the school. Our top funding priority is to raise funds to support the expansion, equipment, and enhancement of the EABH Campus through the EABH Master Plan. Donors who contribute at a level of R$250,000+ are recognized as members of EABH’s Leadership Donor Circle and are honored on EABH´s Donor Wall for their extraordinary dedication to the school.
The results of the Future Campaign, launched from 2019-2021, have been directed to support the Phase 1 of the EABH Master Plan. Funds raised supported the equipment of the 12 learning spaces of our state of the art building, Bloco 1, which was inaugurated in 2022, Bloco 1 and features a STEM Lab, comfortable and flexible furniture, touch screen TVs. We thank all of our donors that have made achieving this goal possible.
As we embark on the second phase of our Master Plan, with the construction of the third floor of Bloco 1 as well as the structure of Bloco 2, including one functional floor, the continued support of our donors through major gifts will be very important.
We know that our community has the potential to continue the legacy that families before them began to pave the path towards the future of EABH, through their belief and contributions..
We thank all stakeholders for their continued support as we build the future of international education in Belo Horizonte.
To learn more about the EABH Future Program and how you can make a difference, please contact our Development Officer at +55 (31) 3319-8300 or via eabhfuture@eabh.com.br
Transformational gifts are a powerful way to support our strategic priorities and long-term vision. Our primary focus is the expansion and enhancement of our campus through the EABH Master Plan.
Donors who contribute at a level of R$250,000+ are welcomed into EABH’s Leadership Donor Circle. These donors are honored on our permanent Donor Wall as a tribute to their extraordinary dedication and legacy.
Celebrating Our Progress: Phase 1 The Future Campaign (2019–2021) successfully supported Phase 1 of our Master Plan. These funds allowed us to fully equip Bloco 1, our state-of-the-art building inaugurated in 2022. This facility features a specialized STEM Lab, touch-screen technology, and flexible, modern learning spaces. We are deeply grateful to the donors who made this milestone possible.
Looking Ahead: Phase 2 As we embark on the second phase of our journey, we are focused on the construction of the third floor of Bloco 1 and the foundational structure of Bloco 2. Major gifts will be vital to the success of this expansion. We believe our community has the power to continue the legacy of the families who came before us, paving the way for the future of EABH.
The EABH Master Plan: A Blueprint for Excellence Expanding, Equipping, and Enriching our Learning Experience
The EABH Master Plan is a multi-phase project developed in collaboration with educational specialists and leading school architects. Our goal is to maximize student potential by offering facilities where they can:
- Collaborate in open, modern environments.
- Take Positive Risks and dare to be creative.
- Thrive within a personalized and innovative methodology.
This ambitious project provides world-class facilities that match the excellence of our academic programs. More than just a construction project, the Master Plan embodies our unwavering commitment to providing exceptional educational opportunities for every student.
In July 2025, EABH launched its most transformative construction initiative to date—a R$29 million+ commitment to expanding and enhancing our campus. This phase of the Master Plan is a proactive response to our sustained growth; with approximately 25 new students joining us each year, these upgrades ensure we continue to offer an exceptional environment as our community expands.
This ambitious project is carefully phased to minimize disruption while modernizing our facilities. From July 2025 to June 2027, our focus will be on the following key developments:
- Upper School Expansion: We are constructing six new, purpose-built classrooms on the current rooftop of Bloco 1. These modern spaces will provide the crucial capacity needed for our older students to thrive both academically and socially.
- Infrastructure & Efficiency: We are continuing our Power Expansion Project, which includes a new substation and metering cabin. This ensures a continuous, reliable energy supply and improves the overall operational efficiency of our campus.
- New Facilities – Bloco 2: This phase includes the complete structural construction and external closure of Bloco 2, a seven-story building (six floors plus a rooftop). We are excited to announce the scheduled delivery of a fully completed classroom floor by July 2027.
These enhancements represent more than just new buildings; they are a commitment to providing quality early childhood options and upgraded learning spaces for all our families.
The phase 1 of the EABH Master Plan, initiated in 2019 until 2022, included:
SAAGE Hall: A Hub for Creativity Designed to host our Arts Pillar (Music, Drama, and Visual Arts), this floor is dedicated to social and experiential learning. It features a large multipurpose space with flexible partitions, offering students ample room to eat, play, and practice sports. It is a place where students can unleash their imagination—creating, acting, singing, and composing—while exploring innovation and sustainability in our integrated garden.
Secure Access & Pedestrian Paths: Built in partnership with the U.S. State Department, our main entrance ensures safety and smooth movement for our community. Families and staff can easily access the campus through dedicated car gates or secure pedestrian paths.
Bloco 1: Innovation in Action Currently serving our Upper School, this facility features two floors with 12 modern learning spaces and a specialized STEM Lab. The building uses green technology for natural lighting and ventilation. As part of Phase 2 of our Master Plan, a third floor is currently under construction to further expand our capacity.
Our Award-Winning Kitchen & Meal Service: Unlike many schools, EABH manages its own meal service with an internal nutritionist and a dedicated culinary team. We serve over 1,500 healthy, balanced meals daily. We are proud to have completed a full renovation of our kitchen, which now features industrialized appliances, temperature-controlled storage, and dedicated preparation areas that exceed strict hygiene and safety standards.
Enhanced Athletic Facilities: We have modernized our gym by relocating and upgrading our locker rooms. These new spaces include dedicated rest and work areas for our staff, as well as specialized athletic offices and storage to better support our sports programs.
Sustainable Infrastructure: To maximize ground-floor space for student play and learning, we have implemented an underground solid waste shelter. This innovative solution ensures recycling management and sanitary disposal are handled discreetly, keeping our open areas clean, fresh, and safe for our students.
Experience Our Evolution
Our Master Plan represents the future of learning at EABH. We invite you to see our progress through these milestones:
- [Watch: The Evolution of our Master Plan (May 2021)]
- [Watch: Celebrating the Completion of Bloco 1 (Nov 2021)]
We still have much work to do, and your support makes all the difference!
Contact
To learn more about the EABH Future Program and how you can make an impact, please contact our Development Officer at +55 (31) 3319-8300 or via eabhfuture@eabh.com.br